The wellhead facilities and flow lines for this project were implemented in two phases: initial and final production. The project includes 20 wells—8 for initial production and an additional 11 wells plus a water disposal well for final production. It involves a main engineering, procurement, and construction (EPC) contract, along with other activities necessary to transport crude oil from each well to the gathering manifold located at the entrance of the Central Processing Facility (CPF).
These activities encompass the construction of well cells for drilling rigs, laying flow lines and fiber optic cables along these flow lines, installing power transmission lines, and establishing wellhead facilities such as flare wells, access roads, cabins housing wellhead control panels (WHCP), remote terminal units (RTU) for Supervisory Control and Data Acquisition (SCADA), and high-integrity pressure protection systems (HIPPS), among others.