The project was executed in two phases: initial and final production. It encompasses engineering, procurement, and main construction (EPC), covering all activities related to the transportation of crude oil, sweet crude oil, and sour gas from the Central Processing Facility (CPF) to the Dehloran and Cheshme Khosh production stations. These activities include constructing approximately 200 km of right-of-way (ROW), a 130 km-long 16-inch sour oil pipeline, a 130 km-long seamless sour gas pipeline, and a 63 km-long 16-inch sweet oil pipeline. The project also involved crossings of roads and rivers, installation of Line Break Valve (LBV) stations, pig launchers and receivers, cathodic protection stations (CPS) and their power supply lines, fiber optic cables along the pipelines, and the deployment of a Supervisory Control and Data Acquisition (SCADA) system, Remote Terminal Units (RTUs), and associated control systems such as CCW and HTD.